AI calorie counter

Count calories from a photo in 5 seconds

Snap your plate, type or say what you ate, and nodiet.ai works out calories, macros and fiber and shows how much is left for the day.

Download on the App Store Get it on Google Play
  • Core features are free
  • No sign-up required
  • iOS, Android and web
nodiet.ai camera recognizing oatmeal with fruit and counting macros

Food photo

Oatmeal with fruit

Oatmeal with fruit

≈ 250 g · recognized from photo

313 kcal

Protein
8 g
Fat
7 g
Carbs
51 g
Fiber
6 g

Bars show share of your daily goal

Log food the way that suits you right now

No searching a food database or weighing every bite. You can always adjust the result by hand.

Photo

Snap your plate

AI recognizes the foods, estimates the portion and counts macros for every ingredient.

nodiet.ai camera recognizing dinner ingredients: salmon, quinoa and asparagus

Food photo

Salmon

Quinoa

Asparagus

Text

Type it

For when you have no photo.

“Oatmeal with milk, a banana and coffee with sugar”

Voice

Say it

Dictate on the go — we transcribe and count.

Assistant

Ask the AI assistant

How to hit your protein goal at dinner, how much is left for today — and log what you ate right from the chat.

What else nodiet.ai can do

Goals that fit you

The app calculates your daily needs with the Mifflin–St Jeor equation and sets goals for macros, fiber, water and weight. Lose weight, maintain or gain — your call.

Calculate your calories online
nodiet.ai macro goal calculation

A food diary without the chores

All meals in one feed, every dish broken down by ingredient, portions easy to adjust. Save favorite dishes to your catalog and add them in one tap.

nodiet.ai home screen: daily macros, water and weight

Progress without pressure

Calories and macros for the week or any period, weight and BMI, water and your streak. See how your habits change — no judgment.

nodiet.ai weekly nutrition stats

Syncs with Apple Health and Health Connect

Meals and water go to Apple Health on iPhone or Health Connect on Android on their own, and weight and height sync both ways. Steps and active calories come back, so your calorie and macro target adjusts to your activity every day. Included in Pro.

nodiet.ai smart target based on Apple Health activity

Reminders and export

Get a reminder to log meals at the times you choose — and none if you already logged. Export your diary to PDF to share with a doctor or coach.

Free or Pro

Counting calories is free. Pro removes the limits for people who log every day.

Free

$0

  • Photo, text, voice and assistant
  • Diary, goals and calorie calculator
  • Water, weight and reminders
  • AI requests with a limit
  • Voice input once a day
  • One PDF report a week

Pro

  • More AI requests
  • Unlimited voice input
  • Unlimited PDF reports
  • Stats for any period
  • Apple Health and Health Connect sync

Prices are shown in your app store.

The free trial is available on the 3-month plan only. Cancel anytime — we'll remind you 2 days before each charge.

Download on the App Store Get it on Google Play

Frequently asked questions

How do I count calories from a photo?

Open nodiet.ai, tap the camera and take a photo of your plate. AI recognizes the foods, estimates the portion size and counts macros and fiber for each ingredient, usually within seconds. No photo? Describe the meal in text or by voice.

How accurate is AI at counting macros from a photo?

Accuracy depends on how clearly the dish is visible: AI estimates the portion from the photo and may miss hidden ingredients such as oil, sauce or sugar. That is why results are broken down by ingredient — you can fix any item, change the portion weight or add what the photo does not show.

Is nodiet.ai free?

Yes, the core features are free: every way to log food, the diary, goals, the calorie calculator, water, weight and reminders. The free plan has limits on AI requests, voice input and PDF reports. Pro removes those limits; prices are shown in your app store.

Can I use it without signing up?

Yes. Install the app and start logging food right away — no account needed. You can create one later, for example to keep your diary when you switch phones; all your entries are kept.

Which devices does nodiet.ai work on?

On iPhone (App Store), Android (Google Play) and in the browser at app.nodiet.ai.

How is my daily calorie goal calculated?

With the Mifflin–St Jeor equation: first your basal metabolic rate is calculated from sex, age, height and weight, then multiplied by an activity factor and adjusted for your goal: −15% to lose weight, +15% to gain. You can try it in the calorie calculator on this site.

How is nodiet.ai different from FatSecret and YAZIO?

In FatSecret and YAZIO you usually search a food database and log items by hand. In nodiet.ai a photo, a short text or a voice note is enough — AI calculates the macros, and the assistant answers nutrition questions. You can start for free without signing up.

Can I export my food diary?

Yes, you can export your diary to PDF, for example to share with a doctor, dietitian or coach. The free plan includes one report a week; Pro has no limit.

How do I cancel my subscription?

Anytime: in App Store or Google Play settings if you subscribed there, or in your nodiet.ai profile if you paid in the browser. We send a reminder 2 days before each charge.

Is my data safe?

Yes. Your data travels over an encrypted connection and is used to run the app — to recognize food and do the math. We never sell it. We use anonymized analytics to improve the app; see the privacy policy for details.

Log your first meal — it takes 5 seconds

Free, no sign-up.

Download on the App Store Get it on Google Play